YSA

Yachting Systems of America, LLC.

1041 West 18th Street
Costa Mesa, California 92627 USA

Phone: 949-642-9530  Fax: 949-642-9550

 

FURLBOOM PRICING

As of 1/31/01

Prices are subject to change. Please contact a sales representative for updated pricing and to take advantage of any current offers and/or promotions.

P = Sail Luff     E = Sail Foot  *See drawing below

Maximum 'P' in Decimal Feet Maximum 'E' in Decimal Feet Maximum 'P' in Meters Maximum 'E' in Meters Recommended Vang Retail Price  (fob Costa Mesa, CA) US Dollars
Series 2
F2-040-0000 39.37 13.12 12.00 4.00 Selden 20S Rigid Gas Strut Call For Quote
F2-050-0000 39.37 16.40 12.00 5.00 Selden 20S Rigid Gas Strut Call For Quote
Series 3
F3-040-0000 45.93 13.12 14.00 4.00 Selden 20S Rigid Gas Strut Call For Quote
F3-050-0000 45.93 16.40 14.00 5.00 Selden 20S Rigid Gas Strut Call For Quote
F3-060-0000 45.93 19.69 14.00 6.00 Selden 20L Rigid Gas Strut Call For Quote
Series 4
F4-060-0000 59.06 19.69 18.00 6.00 Selden 20L Rigid Gas Strut Call For Quote
F4-065-0000 59.06 21.33 18.00 6.50 Selden 20L Rigid Gas Strut Call For Quote
F4-070-0000 59.06 22.97 18.00 7.00 Selden 20L Rigid Gas Strut Call For Quote
Additional options
Anodized Boom Shell Included
Painted Boom Shell Call For Quote
Additional hardware
Vang Bracket 3/8" Call For Quote
Vang Bracket 1/2" Call For Quote
Selden 20S Vang Call For Quote
Selden 20L Vang Call For Quote

Top of Page | Home

Top of Page | Home

ADDENDUM I

Furlboom offers sail performance along with ease of operation from the safety of the cockpit, with range of features that exceeds any of its competitors.

 

SAFETY AND PERFORMANCE:

Furlboom allows for a conventional full cut mainsail, with full battens, with normal luff curve and roach, and it can be fitted to pre-bent masts. Sail performance is equal to a conventional cruising mainsail. It is better then other in-mast and in-boom systems.

Sail-handling effort is decreased. The mainsail can be raised and lowered by one person from the safety of the cockpit at a wide range of wind angles. Continuous reefing can be easily, quickly, and safely accomplished. In the unlikely event of a mechanical failure the mainsail will fall to the deck once the halyard is released like a conventional mainsail.

Furlboom offers an automatic outhaul adjustment, sail flattening control, and progressive sail flattening when reefing to control sail shape and de-power the sail.

The Furlboom is not dramatically heavier than a conventional boom (with a flaked sail on it) and adds minimal weight aloft.

 

SAIL AND INSTALLATION COSTS:

Furlboom mainsails are less costly to manufacture than a conventional mainsail because they involve less handwork.

A Furlboom installation involves adding luff foils to the back of the mast and mounting a drive box to the back of the mast. The 24" foils are easily attached with two screws and slugs that install in the sail track. The drive box is attached with 10 tapped 5/16" bolts. These installation steps are the simplest and least costly of any in-boom furler. Mast foils can be installed on a stepped or unstepped mast (the latter is simpler and less time consuming).

Top of Page | Home

OTHER FEATURES:

Furlboom has an integrated and fully enclosed sail cover that allows the sail to be covered in seconds.

The Furlboom is constructed using anodized aluminum, stainless steel and bronze components, and Sunbrella fabrics.

Furlboom is tapered for less weight and a more streamlined look.

Furlboom’s claw is internal for appearance and sail shape reasons.

Furlboom utilizes a four cavity reinforced construction for rigidity and strength.

Furlboom requires no modification for use with center boom sheeting.

Furlboom utilizes non-welded construction using aircraft epoxy and concealed fasteners.

There is no shaft through the mast.

There is no equipment installed on the front of the mast to interfere with a spinnaker pole or sheets.

Furlboom has a floating roller feeder system to prevent sail jamming and chafing.

Mast foils are an extension of the mast for appearance and aerodynamic reasons.

Furlboom has a one-piece PVC luff track that facilitates smooth sail movement without lubricants, and prevents the luff tape from coming into contact with the alloy foils.

Furlboom has a forward open boom design and rollers to prevent sail chafing and potential luff buildup and binding, and allows some leeway in the boom angle.

A Manual winch handle furling backup exists.

Furlboom has a locking ratchet system that maintains luff tension without reliance on the furling line.

Furlboom comes standard with an anodized aluminum finish and offers optional finishes.

Furlboom has a 3 year limited warrantee.

Top of Page | Home

ADDENDUM II

 

Note:    Sail must be made in accordance with Furlboom’s Sail Making Instructions.  The boom quoted is based on the sailcloth weight described in the quotation.

 

Base pricing includes the following:

 

Boom – Anodized Aluminum

Mandrel

Gooseneck

Integrated Sail Cover (Sunbrella)

Drive Box

Rope Drive

Luff Extrusions - Foil

PVC Luff Insert “Tuff Luff”

Top Sheave Foil (accepts 10 mm = 1/2” maximum halyard diameter)

Feeder Foil

Vang Bracket – One on Boom

Main Sheet Hanging Brackets – Three

Sail Making Instructions

Installation Instructions

3 Year Limited Warrantee

 

Required Equipment (NOT included in Base Price):

 

Top of Page | Home

Center Boom Sheets must use a Minimum of 3 Block Hangers

Non-Stretch Halyard

Furling Line to Cockpit (10mm = 3/8”)  (required  with Rope Drive )

Halyard to Cockpit Turning Block (required with Rope Drive )

Lock Pin Release Line, 2 Blocks, and Cleat (required with Rope Drive )

Rigid Gas or Spring Vang

Bottom Mast Vang Bracket (required with Vang)

 

Optional Equipment (NOT included in Base Price):

 

Mast Vang Bracket

Boom Brake (recommended)

Topping Lift – Adjustable (recommended)

Spectra Halyard (10mm = 3/8”)

Hydraulic Drive Motor

Electric Drive Motor

Optional Finishes:  Awlgrip or Imron Paint available (add $ 600.00 any color)

Selden Gas Vang

 

Freight, Installation, and Sail Costs are not included.  Installation is typically 8 to 12 hours for an experienced installer and an occasional helper.

Top of Page | Home